On Friday 13th October 2023 our friend Frank Everest will be using one of his mini-diggers under Forestry England supervision to clear the silt and debris from about 50 grips along the trails in Hodgemoor Woods. Thank you Frank
-
- A grip is what Forestry England call a water run-off, that is a hollow in the earth next to the trail into which rainwater can flow. Why are they important? If water lies on the trail then the passage of cyclists and especially horses turns the surface into mud and breaks up the hardcore hoggin if which the surface is made. Such degradation massively shortens the life of the trails on which the Hodgemoor Riding Association has spent over £250,000. You can see the detail of these sums on our web site at HodgemoorRidingAssociation_21year_income_deployed
- With the passage of time silt and debrtis runs off the trails and fills up the grips, rendering them useless. See the four images at the bottom of this page. Regular emptying of the grips is therefore essential. We will be giving attention to those on the steep parts of the trail, notably at the Mount, where diagonal channels lead rushing rainwater away from the path. The places where work is needed have been indcated with yellow marker on 10 October (right).
- We can remind members that at the request of Forestry England cyclists have been permitted to use the horse trails, without contributing money, since 2017. Cyclists are not allowed anywhere else in Hodgemoor, neither on the footpaths nor free-riding.
- The minutes of our last AGM recorded “370 metres of trail repairs were done in October 2019 at a total cost was for £29,800 to which the Association contributed £15,300, about half. Forestry England agreed to pay half this time because of new regs imposing on us a contractor which was more expensive than our regular one. You can see a map at https://hodgemoor.org.uk/wp-content/uploads/2019/09/hodgemoor_trail_works_2019_map.pdf · With income of about 5,000 p.a., the Association would by 2024 have about £28 ,000 available with which we could rebuild 350 metres if the rate is still £80/metre (if FE do not contribute). Forestry England would prefer to wait till 2024 and do more metrage as the last works were disruptive. With that in mind, the the Chairman and Secretary proposed next works in 2024, for economies of scale. The meeting agreed.”
- How are we doing with trail repairs? We request members (and walkers and cyclists) to let us know where you think work is needed. Susie and Marcus are compiling a list which will be submitted to Forestry ENgland shortly after the AGM of Monday 20th November. Speak now! Your help is much appreciated (and of course useless if after Nvember!). If a member would like to suggest expenditure of club funds ouside Hodgemoor then please do so. We do have reserves, as published on https://hodgemoor.org.uk/downloads/, Treasurer’s Reports